BDK Earthmoving have worked with key industry organisations including CPB, John Holland, Brown’s Property Group,Webster Limited and other industry giants
Taubro Ag Ring Tank Extension - Garah NSW
190,000 cubic meters cut to fill.
Storage dam wall reconstruction to allow for prime utilisation of paddocks.
Comdain - Nyngan NSW
650ML Drought Relief Storage Dam
Clay Liner, Rock Beaching, 250,000 Cut to Fill
Yoothapina Feedlot - Ingelstone QLD
1.3M cubic meters cut to fill, 10 kms of tail water drains installed, 5kms of hauls roads constructed. Sump with inlet installed.
CPB Contractors/Leighton’s - Ord River Irrigation Scheme Kununurra, WA
Bulk earthworks were completed including; roadway construction, pavement preparation and a detailed final trim
Bulk earthworks were completed including; haul road construction, rail loop construction and placing track ballast rock
ACE Contractors Post Entry Quarantine Facility Mickelham, VIC
Bulk earthworks were completed including; roadway construction, pavement preparation and a detailed final trim.
Trident Group/Powercor Wind Farm Terminal Station Elaine, VIC
Bulk earthworks were completed including; removal of unsuitable material, roadway construction, substation foundation and a detailed final trim.
Brown's Property Group Ballarto Road Subdivision Clyde,VIC
Using the largest fleet of scrapers in Victoria, a cut and fill of 750,000 Cu were completed to ensure 98% modified compaction throughout the sub divison.
Webster Limited - IrrigationDamDarlington Point, NSW
Bulk Earthworks were completed including; 1.3MillionCu.M embankment fill,5760 Megalitre dam excavation and 6km of dam wall construction.
Image is Webster Limited Project in Drive
Holland MPC Group Joint Venture Wentworth to Broken Hill Pipeline, NSW
Under level 1 supervision, bulk earthworks were completed including; level 1 wall construction, inlet and outlet trench excavation, two 400 Megalitre dam excavations, preparation of clay lining and installation of HDPE dam liner
CPB HEB Joint Venture - Transmission Gully Motorway Wellington, NZ
An array of equipment was shipped to NZ to complete bulk earthworks including; roadway construction, pavement preparation and a detailed final trim.
Tomingley Gold Operations Tailings Dam Construction NSW